Description:
Phase 1—WPC 35 Dry Ingredients Expansion. Extension to existing Abbott Ireland Nutritional Division Facility, Cootehill, Co. Cavan.
The project comprised :
-
Strengthening works to increase load capacity of existing foundations at ground floor level
-
Reinstatement of Epoxy Terazzo seamless floor finish by specialist flooring contractor.
-
Structural steel framed extension constructed above existing metal deck and concrete flooring to 1st, 2nd and third floors
-
New cladding and roofing to match existing adjacent.
The project requires facilitating of specialist vendors installation of large hoppers to formed opening’s between new floors, prior to building being fully sealed.