Description:
A landmark multi-storey, mixed use, Design and Build development, comprising commercial office, residential and retail outlets. The gross internal floor area extends to 50,000m2 over eight storeys including basement on a site exceeding 1.2Ha in a densely populated commercial and residential urban area within inner city Dublin.
The project incorporated large scale demolition of existing buildings including asbestos removal, erection of a concrete frame with curtain wall, stone panels, brick and timber façade over basement and podium slab. Due to the campus location, within the Docklands area and adjacent to the River Tolka and close proximity to Dublin Port, the ground conditions necessitated deep pile foundations. The high specification offices included Grade A owner occupied offices and high energy efficiency targets were achieved as noted in the air tightness test report.
Phase 1 - Demolitions & Design & Build of Residential Apartments - €20 million
Phase 2 - Design & Build of Commercial Offices & Retail Units - €44 million
Phase 3 - D&B Office Fit-out Block One (Cat A & Cat B) - €10 million
Phase 4 - D&B Office Fit-out Blocks Two & Three (Cat A&B) - €26 million (to BIM Level 2)